publication venue for
- Large-scale system control based on decentralized design. Application to Cuinchy Fontinette Reach. 47:11105-11110. 2014
- Sensor fault diagnosis of inland navigation system using physical model and pattern recognition approach. 47:5309-5314. 2014
- An event procedure management to support decision-makers in prospective and real-time project management. 46:195-202. 2013
- Generalized covering location problem with multiple-coverage: Exact and heuristic method. 46:442-447. 2013
- On the long-term stability of bootstrap-type particle filters. 45:1131-1136. 2012
- Subspace Identification for Linear Periodically Time-varying Systems*. 45:1282-1287. 2012
- Subspace Instability Monitoring for Linear Periodically Time-Varying Systems*. 45:380-385. 2012
- Coupling system design and project planning: discussion on a bijective link between system and project structures. 45:1089-1094. 2012
- A verification approach applied for analyzing collaborative processes: the Anticipative Effects-Driven Approach. 42:1352-1357. 2009
- Coupling product configuration and process planning with constraints. 42:63-68. 2009
- An Advanced ATP Decision Support System in Stockout Situations. 41:8345-8350. 2008
- An approach for evaluating enterprise organizational interoperability based on enterprise model checking techniques. 41:12899-12904. 2008
- Model Transformation of Collaborative Business Process into Mediation Information System. 41:13857-13862. 2008
- COLLABORATIVE INFORMATION SYSTEM DESIGN: FROM PROCESS MODEL TO INFORMATION SYSTEM MODEL. 39:615-620. 2006
- MANAGEMENT BY PERFORMANCE OF SUPPLY CHAIN PROCESSES WITH THE REED METHOD. 39:565-570. 2006
- RISK ANALYSIS FOR COOPERATION POLICIES BENEFITS IN REDUCING THE BULLWHIP EFFECT. 39:585-590. 2006
- TOWARDS A FRAMEWORK FOR INTEGRATING RISK AND BUSINESS PROCESS MANAGEMENT. 39:647-652. 2006
- Towards an Approach Gathering Product and Process Configuration as a Constraint Satisfaction Problem. 37:51-56. 2004
- Knowledge and Skills in Design and Production. 33:389-394. 2000
- A Verification Approach Applied for Analyzing Collaborative Processes: The Anticipative Effects-Driven Approach 2009